Civil

COURSE DETAILS

We are good in PRIMAVERA training

CCUBE TECHNOLOGY providing Courses are designed after a deep research with industry experts, Placement Officers, Technical Heads. These courses are designed and made as per industry standards and are planned with such a way that the job seekers or students must get a job after successful completion of the training course. These training courses are full of hands-on project practicals, personality development and resume writing sessions, mock tests, exams, interviews.

Checkout some our placements training

Primavera was launched in 1983 by Primavera Systems Inc., which was acquired by Oracle Corporation in 2008. Primavera P6 is a software used by owned by Oracle. It is used by project management professionals and also can be linked with ERP systems. It handles multiple projects and can hold up to 100,000 activities with unlimited resources and an unlimited number of target plans. It's basically MS Project on steroids.Mainly used for Planning, Monitoring , Controlling and Reporting a project. Used by Planning engineers in Construction field.

  • To improve the quality of design.
  • To increase the productivity of the engineer.
  • To create a table/database for manufacturing.
  • To improve communication & interpretation through documentation

The main objective of the Training is to equip students with not just technical training but also much-needed career assistance. With its placement support, C Cube Technologies assists students in getting placed in top MNCs.

  • Prophet The task executives programming utilized arranging, making due, and doing undertaking made to deal with both little ventures wide range of enterprises, including producing, has been doing as such whole way across the world for over 30 years. all the way back Frameworks would later become increment in fame over resulting fifteen firm frameworks forms during part 1990s because of improvements in server innovation: a work area program leaned toward by workers hire, providers, assembling an electronic undertaking arrangement. Prophet gained Primavera Frameworks in 2008, and from that point forward, the organization formed the program into the ongoing cycle. The fresher form markets itself as an instrument to assist you with arranging all the more successfully, which brings down the probability of plan overwhelms. It makes this case, among others, by empowering perceivability into the assignment so that any bottlenecks can be found and dispensed with before they bring about delays. It expresses that it takes on positions, everything being

  • Therefore, Primavera enjoys many benefits, especially in overseeing assets, diminishing dangers, and projecting business development. Obviously, there is consistently an interest for those with top to bottom information on programming. Overseeing Undertaking Exercises: Primavera P6 takes into account the association of task exercises as well as venture arranging, the executives, and cycle checking. To be more exact, there are around 100,000 tasks that can be arranged with incalculable objective goals and assets. Promptly accessible data: The device empowers itemized arranging and booking. By clicking a button, specialists from different offices, including project chiefs, arranging regulators, project organizers, and different experts engaged with projects, may in a split second get the required information.

    USAGE OF TASK

  • Task usage,
  • Resource usage

    EXPORTING REPORT

  • Tracking,
  • Tracking Gantt and Reports

    RESOURCE CREATION

  • Resource Creation,
  • Apply The Resource In Activity,
  • Resource Graph.

    Primavera Syllabus

    Getting started

  • Introduction to Project Management,
  • Introduction to PRIMAVERA Software,
  • Settings.

    Setting GUI & CALENDER

  • GUI Explanation of PRIMAVERA
  • How to create new sheet and opening Sheet,
  • Toolbar settings,
  • CALENDAR:
  • Create different type calendar
  • Assigning calendar in projects

    ACTIVITY DEFINE

  • Introduction of Gantt chart, Activity Details
  • Create activity and activity ID
  • How to create duration

    EXPLAIN ABOUT CPM

  • How to create network diagram
  • CPM Duration

    EXPLAIN ABOUT PDM

  • How to create network diagram
  • PDM Duration
  • PDM Calculation

    EXPLAIN ABOUT WBS

  • WBS and WBS Codes,
  • Requiring task,
  • Constraint types

Our Projects

Contact Us

Our 24/7 Emergency service,If you have any plan to do couse if any tecnical need, simply contact us.

Address

Bus stand Backside, Amman complex

Phone

+91-9843520101